Upgrade of Existing UF System for Water Utilities in Selangor

ISME-REMOX-UF-System-Upgrade-Water-Utilities-Selangor

Refurbish and reprogram the existing UF control system to improve serviceability. Original system involves a singular PLC to control entire plant of 3 UF trains. Newly supplied system will control each UF train with its own PLC with the help of a master PLC.

Solutions

  • Existing main PLC program is split into individual train PLC program so that each train can be shutdown without affecting the other trains.
  • Main PLC and Sub PLC are designed to communicate with each other using OMRON FINS communication network for highest reliability.
  • The main Proface HMI is reprogrammed to accommodate new PLC structure and internal address.
  • Once all hardware is prepared, the system is swapped with the new hardware with minimum downtime to the plant.
  • A SCADA system is also installed in place to allow real-time data monitoring and data logging for future analysis.