Due to the huge power requirement of EO process, a PLC control system developed to help clients operation ensure only the required amount of power is used without wasting excessive energy at a leachate treatment plant.
Solutions
- The efficiency of the EO process is monitored through the conductivity, pH and ORP sensors placed before and after the EO process.
- Using the readings gathered, the system will throttle the EO output power accordingly to maximize plant efficiency using the least power possible.
- A REMOX monitoring system is also installed to ensure the system can be monitored 24/7 and will give out a SMS alarm when things to astray at site.